Skip to main content

Projects

  • Two new insulated risers in an opened wall, with black-insulated branch lines and valves on each floor.

    Dual-temperature riser replacement in a 33-story high-rise

    Aquatherm and copper risers replaced floor by floor while residents lived in the building, each floor with testable branch lines to its heating and cooling units.

    stories
    33
    phased, occupied
    2011–2019
    electro- and heat-fusion joints
    Fusion